FTTU Buildout Progress
 

Our Levelland facilities are located at
601 College Ave.
Levelland, Texas 79336
(806) 568-0687

FTTP Build out from Lubbock to Levelland

In and around Levelland, there are signs of the progress of the buildout. The photos below show an installed network interface device on the building of a local business and a pedestal and fiber marker which serve as the connection point for fiber distribution.

In mid-August our Levelland Office was prepared to open for business with the positioning of “NTS Levelland” signs and a supply of network interface devices ready to go out for installation at our customers.

The 7,500 square foot office/warehouse for NTS Telephone Company in Levelland, Texas includes an equipment room designed to house the electronics and power supply necessary to “light” the fiber optic cable and distribution fiber was installed in a designated ‘beta’ test area.

Phase 2 of FTTP Build out from Lubbock to Levelland
Phase 2 of FTTP Build out from Lubbock to Levelland
NTS Telephone Operations Office
Levelland, TX
Equipment Room housing electronics and backup power


Phase 2 of FTTP Build out from Lubbock to Levelland
NTS Telephone Operations Office
Levelland, TX

Phase 2 of FTTP Build out from Lubbock to Levelland
Phase 2 of FTTP Build out from Lubbock to Levelland
Equipment Room Fiber Terminal Equipment Room Fiber Terminal

Phase 2 of FTTP Build out from Lubbock to Levelland
Phase 2 of FTTP Build out from Lubbock to Levelland
Central Office Power Supply Central Office Power Supply

These photos, taken in October 2008 show the construction of some of the residential and business passings which were completed in November 2008.

Phase 1 of FTTP Build out from Lubbock to Levelland Phase 1 of FTTP Build out from Lubbock to Levelland

Phase 1 of FTTP Build out from Lubbock to Levelland Phase 1 of FTTP Build out from Lubbock to Levelland

Phase 1 of FTTP Build out from Lubbock to Levelland Phase 1 of FTTP Build out from Lubbock to Levelland


The initial construction of the NTS Levelland office which serves as a store front sales office and aggregation point for network distribution.
Phase 1 of FTTP Build out from Lubbock to Levelland

The second phase of the buildout in Lubbock is pictured here as teams completed underground construction work in advance of laying fiber in the ground.

Phase 2 of FTTP Build out from Lubbock to Levelland Phase 2 of FTTP Build out from Lubbock to Levelland
Phase 2 of FTTP Build out from Lubbock to Levelland Phase 2 of FTTP Build out from Lubbock to Levelland
Phase 2 of FTTP Build out from Lubbock to Levelland Phase 2 of FTTP Build out from Lubbock to Levelland
Phase 2 of FTTP Build out from Lubbock to Levelland Phase 2 of FTTP Build out from Lubbock to Levelland
Phase 2 of FTTP Build out from Lubbock to Levelland Phase 2 of FTTP Build out from Lubbock to Levelland

In August 2008 NTS hosted the community of Levelland,Texas for a celebratory picnic in anticipation of the Company’s launch of FTTP service in that market. Approximately 500 Levelland residents attended the event.

Phase 1 of FTTP Build out from Lubbock to Levelland

Phase 1 of FTTP Build out from Lubbock to Levelland

Phase 1 of FTTP Build out from Lubbock to Levelland

Phase 1 of FTTP Build out from Lubbock to Levelland

Phase 1 of FTTP Build out from Lubbock to Levelland

Phase 1 of FTTP Build out from Lubbock to Levelland

During July 2008, fiber was installed across a 30‐mile distance between Lubbock and Levelland, Texas as pictured here.

The fiber offering provides more bandwidth to business and residential customers increasing upload and download speed.


Phase 1 of FTTP Build out from Lubbock to Levelland Phase 1 of FTTP Build out from Lubbock to Levelland Phase 1 of FTTP Build out from Lubbock to Levelland

Phase 1 of FTTP Build out from Lubbock to Levelland Phase 1 of FTTP Build out from Lubbock to Levelland

Phase 1 of FTTP Build out from Lubbock to Levelland Phase 1 of FTTP Build out from Lubbock to Levelland